Please use this identifier to cite or link to this item: http://ds.knu.edu.ua/jspui/handle/123456789/4272
Title: Optimization of preparedness for extraction of balance-industrial mineral reserver
Authors: Шолох, Микола Васильович
Шолох, Николай Васильєвич
Sholokh, Mykola
Keywords: balance-industrial supplies
preparedness
Issue Date: 2018
Publisher: Universitas Publishing
Citation: Sholokh M.V. Optimization of preparedness for extraction of balance-industrial mineral reserver / M.V. Sholokh // Topical issues of resource-saving technologies in mineral mining and processing : multi-authored monograph. – Petrosani, Romania, 2018. – P. 133–165. – Ref.: p. 164–165.
Abstract: Investigational provision of extractive power-shovels industrially-balance supplies with the different degree of preparedness to the booty and quarry overall depends on a time domain between loosening of array of ferrous quartzite’s. Time domain between loosening of array of ferrous quartzite’s in coalfaces and a time domain between the mass loosening can be anything. It is well-proven that effective work of quarry in the case when time domains between the mass loosening of array of balance-industrial supplies and loosening of array of ferrous quartzite’s in coalfaces gather. Reasonably, that an optimal time domain between the mass loosening of balance-industrial supplies in iron-ore careers is in limits from two to three weeks.
URI: http://ds.knu.edu.ua/jspui/handle/123456789/4272
ISBN: 978-973-741-585-1
Appears in Collections:Наукові статті

Files in This Item:
File Description SizeFormat 
Optimization of preparedness for extraction of balance-industrial mineral reserver.pdf504.51 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.